Electricity here runs 17.86 cents per kilowatt-hour
Maryland's electric rates sit above what a lot of states pay. An air conditioner that runs inefficiently turns that rate into a bigger number every single month it's working.
Takes about a minute. No obligation.
Maryland's electric rates sit above what a lot of states pay. An air conditioner that runs inefficiently turns that rate into a bigger number every single month it's working.
Since the rate per kilowatt-hour isn't going to change, the only variable left is how much power the unit pulls to do the job. A more efficient system costs less to run at that same rate, every month it's in use.

NOAA nClimDiv, 1991–2020 normals
A system sized by a room by room calculation fits differently than one sized off the old equipment.
Ask the contractor to show you the load calculation, not just the tonnage they plan to install.




Most homes in St. Mary's County heat with electricity, at 62.1%. Fuel oil comes in second at 13.3%, with utility gas and propane behind that. If your home already runs on electric heat, central air pairs with it the same way it always has, and a straight swap is usually the simplest path. Homes on oil or propane for heat still cool with electric central air, same as everyone else, since AC doesn't run on either fuel. Either way, the installer should size the new unit to your house, not just match what's coming out.
Zone 4A means a new system here has to clear 13.4 SEER2 at minimum, and a federal tax credit is available on top of that for units that go beyond the minimum. That gives you a floor to compare quotes against, not just a price to compare.
Find a contractorWhat drives the cost of an installation is mostly the work the house needs around the unit itself. A straight swap, same spot, same line set, same ductwork, is the cheapest version of the job because the contractor isn't rebuilding anything. Once the ductwork has to be modified, resized, or extended to a new zone, that's labor and material on top of the equipment. The condenser pad, the electrical disconnect, the breaker and the wire gauge all have to match what the new unit draws, and older homes sometimes need that electrical work brought up to handle it. A higher efficiency unit costs more up front but asks less of the ductwork and electrical in some cases, so it isn't always the expensive path once the whole job is priced out.
An oversized air conditioner cools the room fast and shuts off before it pulls the moisture out of the air. The house ends up feeling clammy even once it hits the right temperature. Short cycling like that also wears on the compressor, since starting up draws more strain than running steady. A unit sized correctly runs longer, steadier cycles and actually dries the air while it cools it.
The calculation goes room by room. It accounts for square footage, how much window area faces the sun, and how well the attic and walls hold insulation. Houses that look alike from the street can need different tonnage because one has more west-facing glass or a better sealed attic. The old unit's size tells you what was installed before, not what the house actually needs now, especially if anything about the house changed since then.
Estimates for a typical St. Mary's County home, from EIA household energy data, Maryland fuel prices and NOAA climate normals. Your home will differ.
Install day starts with the old system coming out, not the new one going in. The crew disconnects the refrigerant lines, pulls the old condenser and air handler, and checks what they're working with before anything new gets set. The line set usually gets replaced or flushed, since oil and debris from the old compressor can damage a new one if it's left behind. Once the new condenser is set on its pad and the air handler or coil is in place, the lines get connected, pressure tested, and pulled into a vacuum to clear out air and moisture before any refrigerant goes in. After that the system gets charged, the electrical gets tied in, and the contractor runs it to check airflow, temperature split, and that everything cycles the way it should. A straight swap can wrap up in a day. Anything involving ductwork or electrical work takes longer, since that part of the job isn't on a fixed clock.
