Electricity here runs 17.86 cents per kilowatt-hour
Maryland's electricity rate is higher than what most states pay. A central air conditioner is one of the biggest draws on a summer bill, so that rate applies to it every time it runs.
Takes about a minute. No obligation.
Maryland's electricity rate is higher than what most states pay. A central air conditioner is one of the biggest draws on a summer bill, so that rate applies to it every time it runs.
Two systems that cool a house the same way can use different amounts of power to do it. At Maryland's rate, the gap between a low-efficiency unit and a high-efficiency one shows up clearly on the bill, month after month.

NOAA nClimDiv, 1991–2020 normals
Air conditioners here run June through September.
May is the month to put in a new one, before the heat and the rush both hit.




The size of the unit matters more than anything else on the invoice. A contractor has to work out how much heat your house gains in a day, from the walls, the windows, the roof and the people inside, and match the system to that load. Too big and it cools the air fast but shuts off before it pulls the moisture out, so the house feels clammy. Too small and it runs without stopping and never catches up on the hottest days. Ductwork is the other piece. If the trunk lines and the runs already in place can move the air the new system needs, the job is straightforward. If they're undersized or leaky, the contractor has to account for that too, because a new condenser bolted onto old, inadequate ducts won't perform the way it should.
Montgomery County falls under zone 4A, and any new split system you put in has to meet the federal minimum of 13.4 SEER2. That's the floor, not a recommendation, so it already narrows what a contractor can offer you. A unit that clears it also tends to qualify for a federal tax credit, worth asking about before you settle on a model.
Find a contractorA condenser outside runs for hours at a stretch on hot afternoons, then sits idle overnight. That cycling is normal, but the parts still wear from it. The compressor is the one to ask about, since it's the most expensive part to replace and the reason most warranties exist in the first place. Ask what the compressor warranty covers and for how long, and whether it covers just the part or the labor to put it in too. Ask how the system holds up over years of that daily cycle, not just how it performs on day one. A unit that starts efficient but loses capacity after a few seasons of hard running costs more than one that holds steady.
A new condenser outside needs a matched coil inside to work the way it's rated to. Leaving the old coil in place with a new condenser means the system never runs the way it's supposed to. The refrigerant in the old lines gets recovered before anything is disconnected, since it can't be vented into the air. Once the lines are open, the old pad outside often comes out too, if the new unit's footprint doesn't match it.
Once it's disconnected, the old condenser and coil get hauled off, and the metal in them is worth recycling rather than sending to a landfill. Older systems sometimes hold a refrigerant that's been phased out, which is part of why recovery has to happen the right way before anything moves. Ask how a contractor handles disposal before the work starts, so it is settled rather than decided on the spot.
Estimates for a typical Montgomery County home, from EIA household energy data, Maryland fuel prices and NOAA climate normals. Your home will differ.
On install day the contractor cuts power to the old system before touching anything, then recovers the refrigerant from the lines. The new line set gets run or the old one gets checked for the right size, since a line sized for the old unit doesn't always suit the new one. Once the condenser is set on its pad and the coil is in place at the air handler, the lines get connected, pressure tested, and pulled into a vacuum to clear out moisture and air before any refrigerant goes in. The electrical hookup and a new disconnect box outside come next. Only after all of that does the system get charged and run, with the contractor checking the suction and head pressures against what the manufacturer specifies for that unit. A startup that skips the vacuum or the pressure test can leave a system that runs but never reaches the capacity it's rated for.
